BidTerrierSign in

VALVE,REGULATING,FL, IN REPAIR/MODIFICATION OF

Dept of Defense, Dept of the Navy

27 days leftSolicitationIndustrial parts and hardware
View the official notice at sam.gov

The official notice is always free. Read the full documents there before you bid.

Key facts

Closes
Dec 21, 2026, 3:30 PM ET (27 days left)
Place of work
Location not stated
Notice type
SolicitationA request for offers or bids. This is the notice you respond to.
Solicitation number
N0010426QNE35
Office
NAVSUP WEAPON SYSTEMS SUPPORT MECH
Posted
Nov 23, 2026
Codes
NAICS 332919 | PSC 4820
Contact in the notice
Telephone: 7176056805, stephen.a.knox.civ@us.navy.mil
Source
SAM.gov Contract Opportunities

What this is

A plain-English summary has not been written for this notice yet. The facts above come straight from the notice, and the original description is further down this page.

Similar open bids

  • 61 - Control, Motor, Fan

    Dept of Defense · Location not stated

    Closes todayPresolicitation

    Closes Nov 24, 2026, 11:59 PM ET

  • COLLAR,PIN-RIVET

    Dept of Defense · Location not stated

    Closes todayCombined synopsis and solicitationHUBZone set-aside

    Closes Nov 24, 2026

  • SHEET,METAL

    Dept of Defense · Location not stated

    Closes todayCombined synopsis and solicitationSmall business set-aside

    Closes Nov 24, 2026

  • TRICON,FREIGHT,SPECIFI

    Dept of Defense · Location not stated

    Closes todayCombined synopsis and solicitationSmall business set-aside

    Closes Nov 24, 2026

  • TEST STAND,ELECTRIC

    Dept of Defense · Location not stated

    Closes todayCombined synopsis and solicitation

    Closes Nov 24, 2026

More industrial parts and hardware bids

Recent awards from Dept of Defense

Award notices this agency published, as listed by the source.

Original description from the notice

CONTACT INFORMATION|4|N744.17|WVD|771-229-2110|stephen.a.knox.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|See specifications Section C and Section E.| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION/ACCEPTANCE POINT|6|TBD|TBD|TBD|TBD|TBD|TBD| GENERAL INFORMATION-FOB-DESTINATION|1|A| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications; COMBO - Receiving Report & Invoice - Material |N/A|TBD|N00104|TBD|TBD|N50286 - 10|TBD|N/A|N/A|N/A|N/A|N/A|N/A|See form DD1423 || NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery.|One year from date of delivery.||||| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(FEB 2026))|2||| WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2||| OPTION FOR INCREASED QUANTITY (MAR 1989)|1|365 Days| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEVIATION 2026-O0015)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| Solicitation N00104-26-Q-NE35 is hereby amended to decrease quantity for NIIN 013633879 from 10 to 6. Extended solicitation due date to 21 Dec 2026. All other Terms and Conditions remain the same. \ 1. This requirement is pursuant to Emergency Acquisition Flexibilities (EAF). 2. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. 3. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or set be other electronic commerce methods such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 4. If the offeror is not the Original End Manufacturer (OEM) of the material called out in the requirement, the OEM must be stated (Company Name and CAGE) andthe offeror must provide a signed letter of authorization as a distributor on the OEM's letterhead. 5. If requirement will be packaged at a location different from the Offeror's address, the Offeror shall provide the Name, Street Address and CAGE of the Packaging Facility. 6. Any contract awarded as a result of this solicitation will be DO certified for national defense under the Defense Priorities and Allocations System (DPAS). Provision 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use, shall be inserted in solicitations when the contract to be awarded shall be a rated order. 7. Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 8. Please provide repair price as Estimated (EST) for the full repair effort ofthe requirement. 9. Vendor shall have 120 days after receipt of carcass(es) to complete a teardown & evaluation (TD&E) of the carcass(es) and submit a Firm-Fixed Price (FFP) quote for the full repair effort of the carcass(es). 10. When submitting a quote, please include the cost of new (actual or estimated) for evaluation purposes. 11. Quote shall specify any exceptions including but not limited to MIL-STD Packaging, MIL-STD Labeling, Inspection & Acceptance locations, Packaging House, surplus materials, etc. If no exceptions are indicated or received, award shall be basedupon solicitation requirements. Changes or requests for changes after award shall be subject to consideration costs deducted from the unit price. 12. In repair price, include all costs associated with receipt and complete repair of material that may be in unwhole condition, missing hardware, damaged, handling damage, missing parts, wear damage, and CAV Reporting. Also provide the following information: a. Teardown & Evaluation Rate: b. Repair Turn Around Time (RTAT): c. Throughput Constraint: d. Induction Expiration Date: 13. PRICE REDUCTIONS a. Any asset for which the contractor does not meet the required RTAT will incur a price reduction of XXXX per unit. This adjustment will be implemented via aReduction Modification at the end of contract performance. Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's right to terminate for default. 14. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTAT established in the resulting contract. a. Requested RTAT: 832 Days; 15. Quotes shall reference the proposed RTAT and any capacity constraints. \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Identification of Classified Documents - This contract/purchase order requires the Contractor to have authorized access to classified documents in accordance with the attached Contract Security Classification Specification (DD Form 254). The classified documents and security level are: ;4456141 - CONFIDENTIAL; 2.3 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.3.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.3.2 The documents and drawings listed below under DRAWING NO. are not provided with this Contract/Purchase order. DRAWING NO CAGE REV DISTR CD ;25460N 35795 J B 25654N 35795 J B; 2.3.3 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.3.4 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DRAWING DATA=4456141 |80064| A| |F| | | | DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=ASTM-A105 | | | |210101|A| | | DOCUMENT REF DATA=ASTM-A193 | | |A |241015|A| | | DOCUMENT REF DATA=ASTM-A194 | | | |240501|A| | | DOCUMENT REF DATA=ASTM-A216 | | | |180701|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |230223|A| |01| DOCUMENT REF DATA=MIL-DTL-1222 | | |J |001208|A| | | DOCUMENT REF DATA=MIL-STD-2035 | | |A |950515|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=MIL-DTL-15024 | | |G |180303|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A|1 | | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |910101|C| |01| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3. REQUIREMENTS 3.1 REFURBISHED MATERIAL STATEMENT OF WORK (REPAIR SOW) - 3.1.1 INSPECTION - Clean and determine if refurbishment is possible. At disassembly, the Contractor must record all identifying markings found on the parts of each assembly. The Contractor must maintain traceability of these markings to each unit throughout refurbishment. 3.1.2 IDENTIFYING MARKINGS - Part must have a MIC (Material Identification a and Control) code, heat/heat lot code, or unique Contractor traceability number/code that is visible on the part. See Material Traceability in paragraph 3 (Quality Assurance Provisions) of this contract for traceability requirements. The MIC code can consist of a 2, 3, or 4 letter material identifier, 4 or 5 digit Julian date, 3 digit lot serial number, and Certifying Activity Designator (CAD) which will be 1 or 2 letters; the 4 parts are normally separated by hyphens; examples: TIA-3089-30-QQ and ST-06262-506-A. 3.1.3 RE-USEABLE PARTS - - Any parts of the original assembly that are useable (replacement is not necessary), that are properly marked as identified above, and that have material certifications available may be utilized as initially supplied. Certifications are not required to be resubmitted by the contractor. - Any parts of the original assembly that are useable (replacement is not necessary), are properly marked as identified above, but material certifications are not available at the contractor's facility, a waiver must be submitted in accordance with Waiver/Deviation (Configuration Control) requirements specified elsewhere in the Contract. 3.1.4 NON-USEABLE PARTS - -Any parts of the original assembly that are not properly marked as identified above must be replaced and the required certifications must be submitted. - Any parts of the original assembly that are not usable (replacement is necessary) must be replaced and the required certifications must be submitted. 3.1.5 REFURBISHMENT - Upon completion of inspection, this item must be refurbished to be in accordance with ;Leslie Controls, Inc. drawing 25460N, Class QCLNS-1 and Maintenance Standard 5340-081-035 REV E CHG-7; , except as amplified or modified herein. This applies to all "Parts Requiring Certification" as identified elsewhere in this Contract/Purchase Order. 3.1.6 ADDITIONAL SOW REQUIREMENTS - ;N/A; 3.2 ;NOFORN Maintenance Standard 5340-081-035 will be provided by mail if the bidder does not possess it.; 3.3 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;Valve Body, Piece 23; Material - ;ASTM-A216, Grade WCB; Part - ;Top Cap, Piece 16 and Bottom Cap, Piece 30; Material - ;ASTM-A105; Part - ;Studs, Pieces 7 and 13; Material - ;ASTM-A193, Grade B7; Part - ;Heavy Hex Nuts, Pieces 8 and 14; Material - ;ASTM-A194, Grade 2H or 7; 3.4 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings and specifications is still required, but certifications are only required as listed below. Test - 5x Visual Magnification or Dye Penetrant Inspection (root layer) Item - Weldments Performance - T9074-AS-GIB-010/271 Acceptance - MIL-STD-2035 Test - Visual and Dye Penetrant Inspection (final layer) Item - Weldments Performance - T9074-AS-GIB-010/271 Acceptance - MIL-STD-2035 Test - Non-Destructive Tests Item - ;Weld Repair (as applicable); Performance - Per applicable fabrication specification Acceptance - Per applicable fabrication specification Test - ;Liquid Penetrant Inspection or Magnetic Particle Inspection (Wet Method) (Either inspection is acceptable); Item - ;Studs, Pieces 7 and 13 and Heavy Hex Nuts, Pieces 8 and 14; Performance - T9074-AS-GIB-010/271; Sampling must be per MIL-DTL-1222 Acceptance - MIL-DTL-1222 Test - ;Magnetic Particle Inspection; Item - ;Valve Body, Piece 23; Performance - T9074-AS-GIB-010/271 Acceptance - S9074-AR-GIB-010A/278 Test - ;Magnetic Particle Inspection; Item - ;Top Cap, Piece 16 (flanged portion only) and Bottom Cap, Piece 30; Performance - T9074-AS-GIB-010/271 Acceptance - "Quality Statement For The Procurement Of Forgings" Test - Pressure Tests Item - Each Assembly Performance - ;Maintenance Standard 5340-081-035, Section 1.v.; Acceptance - ;Maintenance Standard 5340-081-035, Section 1.v.; ;NOTE: Use pressures for valves AS-1 or AS-2 when testing per Section 1.v. For paragraph 1.v.(3)(b), use Item 7 plus 36 psig of drawing 4456141.; 3.5 Radiography is required on ;Valve Body, Piece 23; . 3.6 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes. 3.7 Heat Treat Requirements - Mechanical properties (via tension testing and hardness testing if hardness is required by the applicable material specification) are required for each heat in each heat treat charge for ASTM-A234, ASTM-A403, ASTM-A182, and ASTM-A105 material. 3.7.1 If heat treatment is performed in continuous-type furnaces with suitable temperature control and equipped with recording pyrometers so that complete heat-treatment records are available, a heat-treatment charge must be considered as any continuous run not exceeding an 8-hr duration. One tension test must be taken from one forging per heat in each heat treatment charge at a minimum of every 8 hours. 3.7.2 Certification of Mechanical Properties (Mechanical Analysis, Tension Testing) must include the condition furnished. The contractor must maintain a complete record on file of the heat treatment given each piece, including stress relief. The contractor must provide either the record of the final heat treatment or a heat treatment certification statement. The certification statement must be signed by the heat-treater and include the date of heat treatment, duration and temperature of heat treatment operations and quenching medium (if required). 3.8 Confidential Hydrostatic Test Pressures - When test pressures are confidential, certification must reference ;drawing 4456141 Revision A; and the item number to which the item was tested in lieu of the actual pressures. Any drawing requirement to mark the working pressure on the item does not apply and is strictly prohibited. 3.9 Thread Forming - The following provides the official interpretation of paragraph 4.5.2.7 of MIL-DTL-1222. 3.9.1 In order to qualify for "Alternate Mechanical Testing" found in MIL-DTL-1222J paragraph 4.5.2.7 and utilize the mechanical properties for the starting bar stock in lieu of performing yield strength or proof stress testing on finished fasteners, all of the subsequent provisions found in MIL-DTL-1222J paragraphs 4.5.2.7 a through e must be met. If any single provision is not met, all required mechanical testing must be performed on the finished full sized fasteners. These provisions are explained as follows: a. Proper product lot control and traceability must be in place. b. No heat treatment (including hot heading and hot forming), cold forming, drawing, rolling and thread rolling may be performed on the starting bar, fastener blanks or finished fasteners after the completion of the mechanical testing on the starting bar. c. and d. The proper size starting bar must be selected to ensure mechanical properties of finished fasteners are represented by the mechanical properties of the starting bar. e. The mandatory testing, axial tensile (studs) and wedge tensile (screws and bolts) must be performed on full sized fasteners. Note that there is a typographical error in paragraph 4.5.2.7 and that the axial load test is a mandatory test that must be performed on studs as required in paragraph 4.5.2.7.e. 3.9.2 Thread rolling is a cold working process and is not considered to be a machining or grinding operation. Therefore, fasteners which have rolled threads do not satisfy the provisions of MIL-DTL-1222J paragraph 4.5.2.7.b and are not eligible for the "Alternate Mechanical Testing" provision. 3.9.3 Thread rolling alone is not a sufficient cold working process to qualify a fastener to be in the cold worked (CW) condition. This condition is only applicable to some 300 series stainless steel studs, screws and nuts. These CW condition fasteners must be manufactured from cold worked bar stock or be cold headed in order to qualify. The threads may subsequently be rolled, machined or ground. Testing of the finished fasteners and/or reporting of the starting bar stock material properties is subject to the same provisions found in MIL-DTL-1222J paragraph 4.5.2.7 and discussed above. 3.10 Component Identification Description (CID) - When applicable drawing(s) and/or specification(s) specify that a nameplate or identification plate is required, the CID number ( ;CID 887095312; ) must be added. When no plate is specified, an identification plate in accordance with MIL-DTL-15024, Type "C" on brass or Type "H" on aluminum must be securely attached to each assembly showing the above CID number. No assembly must be shipped without the

Source: SAM.gov, General Services Administration (public domain). BidTerrier shows public notices as published and cannot confirm that a notice is complete or current. Details can change, so always check the official notice. Nothing here says whether your business is eligible.