CONTROLLER,ELECTRIC, IN REPAIR/MODIFICATION OF
Dept of Defense, Dept of the Navy
The official notice is always free. Read the full documents there before you bid.
Key facts
- Closes
- Nov 23, 2026, 3:30 PM ET (closes tomorrow)
- Place of work
- Location not stated
- Notice type
- SolicitationA request for offers or bids. This is the notice you respond to.
- Solicitation number
- N0038327QPA04
- Office
- NAVSUP WEAPON SYSTEMS SUPPORT
- Posted
- Oct 23, 2026
- Codes
- NAICS 335312 | PSC 6110
- Contact in the notice
- Telephone: 2156975047, bridget.m.murphy6.civ@us.navy.mil
- Source
- SAM.gov Contract Opportunities
What this is
The Department of Defense, Department of the Navy is soliciting offers to repair, overhaul, test and inspect an electric controller. The controller supports a critical shipboard system used to launch or recover aircraft.
AI summary of the public notice. Check the official notice before you bid.
Full summary
The full summary of this notice is for signed-in users
- Who can bid
- Key dates
- What the work includes
- How to respond
- Requirements to watch for
A free account lets you read 3 full summaries a day and save one search with a daily email. The official notice stays free for everyone.
Similar open bids
Next Generation Sequencing (NGS) Reagent Kits
Veterans Affairs, Department of · Iowa City, Iowa
Closes todaySources soughtCloses Nov 22, 2026, 2:00 PM ET
DIP LOOP CAB 46FT
Dept of Defense · Location not stated
Closes todayPresolicitationCloses Nov 22, 2026, 11:00 PM ET
The Department of the Navy is planning to buy 10 dip loop cab units, 46 feet, under NSN 7H-5995-016851442. This is a presolicitation and not a request for competitive proposals. Delivery is FOB origin.
ELECTRONIC COMPONEN, IN REPAIR/MODIFICATION OF
Dept of Defense · Location not stated
Closes todayPresolicitationCloses Nov 22, 2026, 11:00 PM ET
PANEL,POWER DISTRIB, IN REPAIR/MODIFICATION OF
Dept of Defense · Location not stated
Closes todayPresolicitationCloses Nov 22, 2026, 11:00 PM ET
The Department of the Navy plans to buy repair services for two power distribution panels, part number 06550-00801-106. NAVSUP Weapon Systems Support Philadelphia expects to solicit Sikorsky on a sole source basis under an existing Basic Ordering Agreement.
Existing Service Agreement
Health and Human Services, Department of · Durham, North Carolina
Closes tomorrowPresolicitationCloses Nov 23, 2026, 6:00 AM ET
Department of Health and Human Services posted a presolicitation notice titled "Existing Service Agreement". Place: Durham, North Carolina. Responses are due Nov 23, 2026, 6:00 AM ET. The listing has little detail. Read the official notice for the full scope.
Recent awards from Dept of Defense
Award notices this agency published, as listed by the source.
- Dept of Defense · awarded Nov 20, 2026 · US$9,000,000 · to MAGADIA CONSULTING INC Silver Spring MD 20903 USA
- Dept of Defense · awarded Nov 20, 2026 · US$208,800 · to SKO ENTERPRISES INC Coalville UT 84017 USA
- Dept of Defense · awarded Nov 20, 2026 · US$500,000 · to Valkryn Systems Inc New York NY 10012 USA
- Dept of Defense · awarded Nov 20, 2026 · US$50,408 · to INDATEL SERVICES LLC
Original description from the notice
CONTACT INFORMATION|4|N762.44|P2C|(771)229-0524|bridget.m.murphy6.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X|||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and receiving report combo type|Source|TBD|N00383|TBD|TBD|SEE SCHEDULE|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 MONTHS|60 DAYS AFTER DISCOVREY OF DEFECT||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor?s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract. Required RTAT: #550 days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERSDELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred. \ 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 PRE-AWARD / POST AWARD REQUIREMENTS: Due to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended. 1.3 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document. 1.3.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements. Repair of: CONTROLLER,ELECTRIC ;6110-01-703-0671; NSN , ;2056AS4000-G05; Part Number, Shall be performed IAW: CONTROLLER,ELECTRIC ;REPAIR/OVERHAUL/INSPECT IAW APPLICABLE REPAIR MANUALS, TECHNICAL SPECIFICATIONS, ENGINEERING ORDERS AND DRAWINGS. LATEST DRAWING.; Publication (s). 1.3.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998. 1.4 Sampling rates (AQLs) indicated below shall be used in accordance with ANSI Z1.4 for Single Sampling and a General Inspection Level of II. 1.5 In addition to the 100% PCO Mandatory, critical and major characteristics, attributes for plating, hardness and non-destructive testing will be inspected one hundred percent. 1.6 Contractor shall develop a system for identification of individual piece parts for traceability purposes. Markings shall not be permanent. 1.7 An AQL of 1.5 will be used for Class 3 threads and dimensions, and geometric feature controls with a tolerance range of .010 or less. 1.8 For minor characteristics, a sampling rate determined by the contractor and subject to QAR approval will be used. 1.9 The material covered in this contract/purchase order will be used in a crucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital shipboard systems or loss of aircraft. Therefore,the material has been designated as Critical material and special control procedures are invoked to ensure receipt of correct material. 1.10 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;2056AS4000-G05; drawing number ( ;30003; ) ;LATEST REVISION; , Revision ;NAWCAD LKE DRAWING PACKAGE.; and all details and specifications referenced therein. 1.11 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.12 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS DRAWING DATA=PL2056AS1080 |30003| F| |D| | | | DRAWING DATA=PL2056AS1590 |30003| | |D| | | | DRAWING DATA=PL2056AS2040 |30003| A| |D| | | | DRAWING DATA=PL2056AS2080 |30003| B| |D| | | | DRAWING DATA=PL2056AS3000 |30003| H| |D| | | | DRAWING DATA=PL2056AS3010 |30003| H| |D| | | | DRAWING DATA=PL2056AS3020 |30003| H| |D| | | | DRAWING DATA=PL2056AS3030 |30003| L| |D| | | | DRAWING DATA=PL2056AS3110 |30003| | |D| | | | DRAWING DATA=PL2056AS3200 |30003| E| |D| | | | DRAWING DATA=PL2056AS3210 |30003| C| |D| | | | DRAWING DATA=PL2056AS3220 |30003| A| |D| | | | DRAWING DATA=PL2056AS3240 |30003| B| |D| | | | DRAWING DATA=PL2056AS3260 |30003| A| |D| | | | DRAWING DATA=PL2056AS3270 |30003| | |D| | | | DRAWING DATA=PL2056AS3320 |30003| A| |D| | | | DRAWING DATA=PL2056AS3340 |30003| B| |D| | | | DRAWING DATA=PL2056AS4000 |30003|AB| |D| | | | DRAWING DATA=PL2056AS4001 |30003| A| |D| | | | DRAWING DATA=PL2056AS4010 |30003|AC| |D| | | | DRAWING DATA=PL2056AS4020 |30003| F| |D| | | | DRAWING DATA=2056AS1080-G01 |30003| F| |D| | | | DRAWING DATA=2056AS1130 |30003| M| |D| | | | DRAWING DATA=2056AS1210-G01 |30003| A| |D| | | | DRAWING DATA=2056AS1220-G01 |30003| E| |D| | | | DRAWING DATA=2056AS1240 |30003| J| |D| | | | DRAWING DATA=2056AS1250-G01 |30003| A| |D| | | | DRAWING DATA=2056AS1501 |30003| L| |D| | | | DRAWING DATA=2056AS1590-H01 |30003| | |D| | | | DRAWING DATA=2056AS1920-G01 |30003| C| |D| | | | DRAWING DATA=2056AS2040-G01 |30003| A| |D| | | | DRAWING DATA=2056AS2080-G01 |30003| B| |D| | | | DRAWING DATA=2056AS3000-G01 |30003| H| |D| | | | DRAWING DATA=2056AS3010-G01 |30003| H| |D| | | | DRAWING DATA=2056AS3020-G01 |30003| H| |D| | | | DRAWING DATA=2056AS3030-G01 |30003| L| |D| | | | DRAWING DATA=2056AS3040 |30003| A| |D| | | | DRAWING DATA=2056AS3060 |30003| C| |D| | | | DRAWING DATA=2056AS3100-H01 |30003| G| |D| | | | DRAWING DATA=2056AS3110-H01 |30003| | |D| | | | DRAWING DATA=2056AS3200-G01 |30003| E| |D| | | | DRAWING DATA=2056AS3210-G01 |30003| C| |D| | | | DRAWING DATA=2056AS3220-H01 |30003| A| |D| | | | DRAWING DATA=2056AS3220-H02 |30003| A| |D| | | | DRAWING DATA=2056AS3240-H01-H03 |30003| B| |D| | | | DRAWING DATA=2056AS3260-H01 |30003| A| |D| | | | DRAWING DATA=2056AS3270-G01 |30003| | |D| | | | DRAWING DATA=2056AS3320-H01 |30003| A| |D| | | | DRAWING DATA=2056AS3340-H01 |30003| B| |D| | | | DRAWING DATA=2056AS4000-G05 |30003|AB| |D| | | | DRAWING DATA=2056AS4001-G01 |30003| A| |D| | | | DRAWING DATA=2056AS4010-G04 |30003|AC| |D| | | | DRAWING DATA=2056AS4020-H01 |30003| F| |D| | | | DRAWING DATA=2056AS6001 |30003| A| |D| | | | DRAWING DATA=2056AS6005 |30003| B| |D| | | | DRAWING DATA=2056AS6007 |30003| C| |D| | | | DRAWING DATA=2056AS6008 |30003| C| |D| | | | 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: CONTROLLER,ELECTRIC ;2056AS4000-G05; P/N, ;6110-01-703-0671; NSN, ;REPAIR/OVERHAUL/INSPECT IAW APPLICABLE REPAIR MANUALS, TECHNICAL SPECIFICATIONS, ENGINEERING ORDERS AND DRAWINGS. LATEST REVISION.; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the "Government Designated Agency" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements. 3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI SRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract. 3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA). 3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either: 3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the Inventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the contractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK. 3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section 6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed. 3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units determined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior to undertaking repair of the item. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations and DCMA disposal procedures and requirements. 3.5 4.0 PARTS AND MATERIALS 3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material used in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In ad
Source: SAM.gov, General Services Administration (public domain). BidTerrier shows public notices as published and cannot confirm that a notice is complete or current. Details can change, so always check the official notice. Nothing here says whether your business is eligible.