BidTerrierSign in

AZ BL COLO 7528(1) Burro Creek Road

Transportation, Department of, Federal Highway Administration

This bid is closed.

It closed on Nov 17, 2026, 4:00 PM ET. The page stays up for reference. See open general construction bids.

SolicitationSmall business set-asideGeneral constructionPaving and asphalt
View the official notice at sam.gov

The official notice is always free. Read the full documents there before you bid.

Key facts

Closed
Nov 17, 2026, 4:00 PM ET
Place of work
Kingman, Arizona
Notice type
SolicitationA request for offers or bids. This is the notice you respond to.
Set-aside
Small business set-asideA set-aside limits who may compete. The notice states the exact rules.
Solicitation number
6982AF27B000002
Office
6982AF CENTRAL FEDERAL LANDS DIVISI
Posted
Nov 12, 2026
Codes
NAICS 237310 | PSC Y1LB
Contact in the notice
Eric Grosskreuz, cflcontracts@dot.gov
Source
SAM.gov Contract Opportunities

What this is

The Federal Highway Administration is seeking a contractor for a road rehabilitation project on Burro Creek Road in Mohave County, Arizona. The work will improve access to Burro Creek Campground, reduce erosion and maintenance costs, and improve drainage and safety.

AI summary of the public notice. Check the official notice before you bid.

Report a problem with this summary How we use AI

Full summary

The full summary of this notice is for signed-in users

  • Who can bid
  • Key dates
  • What the work includes
  • How to respond
  • Requirements to watch for
  • Size or quantity stated

A free account lets you read 3 full summaries a day and save one search with a daily email. The official notice stays free for everyone.

Similar open bids

  • Yuma Proving Ground Job Order Contract (JOC)

    Dept of Defense · Arizona

    10 days leftSources soughtSmall business set-aside

    Closes Nov 30, 2026, 2:00 PM ET

    The U.S. Army is seeking information from small businesses about a planned Job Order Contract for construction services at Yuma Proving Ground. This is a sources sought notice, not a bid request, and the Army is not accepting quotes, bids, or proposals at this time.

  • iHouse Apartment Construction

    Health and Human Services, Department of · Tonalea, Arizona

    11 days leftSolicitationIndian small business economic enterprise set-aside

    Closes Dec 1, 2026, 5:00 PM ET

    The Indian Health Service, part of the Department of Health and Human Services, is requesting proposals to adapt and construct a 19-unit apartment building at a new location. This is a solicitation for construction work under a firm-fixed-price contract.

  • Cove Day School Replacement & Quarters Constructio

    Interior, Department of the · Cove, Arizona

    13 days leftSolicitationIndian small business economic enterprise set-aside

    Closes Dec 3, 2026, 2:00 PM ET

    Interior, Department of the posted a solicitation titled "Cove Day School Replacement & Quarters Constructio". Place: Cove, Arizona. Responses are due Dec 3, 2026, 2:00 PM ET. The listing has little detail. Read the official notice for the full scope.

  • IDIQ SMALL BUSINESS SET-ASIDE MACC FOR PAVING PROJECTS AT VARIOUS GOVERNMENT INSTALLATIONS LOCATED IN CA, AZ, NV, UT, CO, AND NM

    Dept of Defense · 6 regions: California, Arizona and more

    18 days leftSolicitationSmall business set-aside

    Closes Dec 8, 2026, 5:00 PM ET

    The Department of the Navy is seeking up to six indefinite delivery, indefinite quantity construction contracts for paving projects. The work includes new construction, renovation, and repair at government installations in California, Arizona, Nevada, Utah, Colorado, and New Mexico.

  • 12445127B0001 AZ Lakeside Office Sewer Line Replacement

    Agriculture, Department of · Lakeside, Arizona

    24 days leftCombined synopsis and solicitationSmall business set-aside

    Closes Dec 14, 2026, 2:00 PM ET

    The U.S. Department of Agriculture, Forest Service is requesting bids for the Lakeside Office Sewer Line Replacement. The work will serve the US Forest Service Lakeside District office and connect it to the Pinetop-Lakeside Sanitary District public sewer main.

More general construction bids

Recent awards from Transportation, Department of

Award notices this agency published, as listed by the source.

Original description from the notice

PROJECT DESCRIPTION: Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93. The project's length is approximately 1.3 miles. SCOPE OF THE WORK: The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. The scope of work for this project includes the following major construction activities and items: Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats. Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall. Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project. Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project. The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement. PRINCIPAL WORK ITEMS: Roadway Aggregate: 1,600 TONS Ditch Reconditioning: 2,000 LNFT Full Depth Reclamation: 1.3 MILE Asphalt Concrete Pavement: 3,600 TON 18-Inch Pipe Culvert: 100 LNFT 24-Inch Pipe Culvert: 175 LNFT Boulder: 100 EACH ANTICIPATED SCHEDULE: Advertisement - October 2026 Award-January - 2027 Construction - January 2027 through October 2027 ESTIMATED COST RANGE: Between $2,000,000 and $5,000,000

Source: SAM.gov, General Services Administration (public domain). BidTerrier shows public notices as published and cannot confirm that a notice is complete or current. Details can change, so always check the official notice. Nothing here says whether your business is eligible.