BidTerrierSign in

LEX Triannual Energy Study and ARC Flash Testing

Veterans Affairs, Department of

373 days leftCombined synopsis and solicitationService-disabled veteran-owned small business set-asideElectrical
View the official notice at sam.gov

The official notice is always free. Read the full documents there before you bid.

Key facts

Closes
Nov 30, 2027, 12:00 PM ET (373 days left)
Place of work
Lexington, Kentucky
Notice type
Combined synopsis and solicitationA short announcement and the request for offers in one notice.
Set-aside
Service-disabled veteran-owned small business set-asideA set-aside limits who may compete. The notice states the exact rules.
Solicitation number
36C24927Q0038
Office
249-NETWORK CONTRACT OFFICE 9 (36C249)
Posted
Nov 5, 2026
Codes
NAICS 238210 | PSC H361
Contact in the notice
diane.ziegler@va.gov, diane.ziegler@va.gov
Source
SAM.gov Contract Opportunities

What this is

The Department of Veterans Affairs is requesting quotes for a triennial energy study, arc flash testing, electrical system inspections, and maintenance at its Lexington health care campuses. The request also includes emergency electrical repair and maintenance if circuits cannot be energized after the work.

AI summary of the public notice. Check the official notice before you bid.

Report a problem with this summary How we use AI

Full summary

The full summary of this notice is for signed-in users

  • Who can bid
  • Key dates
  • What the work includes
  • How to respond
  • Requirements to watch for
  • Size or quantity stated

A free account lets you read 3 full summaries a day and save one search with a daily email. The official notice stays free for everyone.

Similar open bids

  • LOU UPS Demarcation Rooms

    Veterans Affairs, Department of · Louisville, Kentucky

    2 days leftCombined synopsis and solicitationService-disabled veteran-owned small business set-aside

    Closes Nov 24, 2026, 1:00 PM ET

    This is a combined synopsis/solicitation from the Department of Veterans Affairs. They are requesting quotes for four uninterrupted power supply (UPS) units and related commercial services.

  • LEX Triannual Energy Study and ARC Flash Testing

    Veterans Affairs, Department of · Lexington, Kentucky

    8 days leftCombined synopsis and solicitationService-disabled veteran-owned small business set-aside

    Closes Nov 30, 2026, 12:00 PM ET

    The Department of Veterans Affairs is requesting a triannual energy study and arc flash testing under a combined synopsis and solicitation. The notice concerns the Lexington facilities, but it does not provide further details about the work.

  • PANEL,POWER DISTRIB, IN REPAIR/MODIFICATION OF

    Dept of Defense · Location not stated

    Closes todayPresolicitation

    Closes Nov 22, 2026, 11:00 PM ET

    The Department of the Navy plans to buy repair services for two power distribution panels, part number 06550-00801-106. NAVSUP Weapon Systems Support Philadelphia expects to solicit Sikorsky on a sole source basis under an existing Basic Ordering Agreement.

  • Electrical Substation Maintenance and Repairs

    Dept of Defense · Fort Buchanan, Puerto Rico

    Closes tomorrowPresolicitationSmall business set-aside

    Closes Nov 23, 2026, 10:00 AM ET

    The Department of the Army is preparing a firm fixed price contract for electrical substation maintenance and repairs at Fort Buchanan. The work will support electrical distribution systems serving military and civilian personnel, tenant commands, schools, housing areas, and other organizations on the installation.

  • OmniMetrix Cellular Generator Monitors

    Dept of Defense · Columbia, South Carolina

    Closes tomorrowCombined synopsis and solicitationSmall business set-aside

    Closes Nov 23, 2026, 10:00 AM ET

    The U.S. Department of the Army is requesting quotes for OmniMetrix cellular generator monitoring services. The contractor must provide the personnel, equipment, supplies, transportation, tools, materials, supervision, and other services needed to perform generator monitoring under the Performance Work Statement.

More electrical bids

Recent awards from Veterans Affairs, Department of

Award notices this agency published, as listed by the source.

Original description from the notice

(i) This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with RFO Part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. This acquisition is a 100% Total Set- Aside for Service Disable Veteran Owned Small Business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. Solicitation number 36C24927Q0038 is issued as a request for quotation (RFQ) for LEX Triennial Energy Study and ARC Flash Testing Service. Site visits are scheduled on Monday 11/16/2026 at 08:00am ET for the Lexington Sousley Campus @ 08:30 AM 2250 Leestown Road, Lexington, KY 4051, Bldg. 20 and Tuesday 11/17/2026 @ 08:30 AM ET for the Lexington Troy Bowling Campus, 1101 Veterans Dr., Lexington, KY 40502 in the main lobby. (Space Left Blank Intentionally) (ii) PRICE/COST SCHEDULE ITEM INFORMATION ITEM NUMBER DESCRIPTION OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT 1001 1.00 JB __________________ __________________ Electrical Power Distribution System and Arc Flash, Coordination, and Short-Circuit studies of all its components at the VA Health Care System two Divisions: Bowling Campus, 1101 Veterans Drive, Lexington, KY Contract Period POP Begin: 12-01-2026 POP End: 03-01-2027 PRINCIPAL NAICS CODE: 238210 - Electrical Contractors and Other Wiring Installation Contractors PRODUCT/SERVICE CODE: H361 - Inspection - Electric Wire and Power Distribution Equipment LOCAL STOCK NUMBER: N/A 1002 1.00 JB __________________ __________________ Emergency repair and maintenance work on a continuous (including overtime) basis if circuits cannot be energized after inspection and maintenance have been accomplished in accordance with the contract. Contract Period POP Begin: 12-01-2026 POP End: 03-01-2027 PRINCIPAL NAICS CODE: 238210 - Electrical Contractors and Other Wiring Installation Contractors PRODUCT/SERVICE CODE: H361 - Inspection - Electric Wire and Power Distribution Equipment LOCAL STOCK NUMBER: N/A GRAND TOTAL __________________ (iii) STATEMENT OF WORK Triennial Energy Study and Arc Flash Testing Department of Veterans Affairs Lexington, KY Bowling & Sousley Divisions, VA Health Care System 1. Introduction: This Statement of Work (SOW) describes the requirements for the maintenance, inspection, testing, and/or calibration of the Electrical Power Distribution System and Arc Flash, Coordination, and Short-Circuit studies on all its components at the Veterans Administration (VA) Health Care System two Divisions: Bowling Campus, 1101 Veterans Drive, Lexington, KY 40502, and Sousley Campus, 2250 Leestown Road, Lexington, KY 40511. These work items are referenced as Maintenance and Testing in this document, hereafter. This SOW describes the requirements for the Qualified Electrical Contract Professionals known as Contractors in this document, hereafter. Contractors who are contracted by VA Medical Center to perform maintenance and testing of the Electrical Power Distribution System, and all its components shall meet all requirements stated in Section 2 of this SOW. This SOW describes the requirements to establish maintenance and testing reports. 2. Qualifications of Contractors: Contractors shall be experienced Electrical Contractors, having properly trained and licensed permanent staff required to perform the proposed work. Electrical Contracting (i.e. the construction, repair, testing and maintenance of industrial and commercial electrical distribution systems) shall be the primary interest/specialty of the Contractor s business. Contractors shall be certified by the International Electrical Testing Association (NETA) or equivalent certifying organization as Certified Technicians with each having completed the Occupational Safety & Health Administration (OSHA) approved 10-hour construction safety training. Superintendent or Project Manager must have OSHA 30-hour construction training. All Contractors employees and/or Sub-Contractors must attend the Veterans Administration Medical Center (VAMC) Contractor Orientation class. Contractors shall have technical training and demonstrable track records of working experience in maintenance, inspection, and testing of the Electrical Power Distribution Systems and related components in healthcare, industrial, educational, and commercial facilities for a minimum of five (5) continuous years. Electrical components on which the Contractors have experience shall include, but not be limited to, switchboards & switchgear (low and medium voltage); low voltage controls; emergency and standby generators; automatic transfer switches, wiring, transformers, meters, grounding, and other electrical appurtenances. Contractors shall have safety trainings either on-the-job or class-room type - in electrical safety outlined in the OSHA Standard 29 Code of Federal Regulations (CFR) 1910 Subpart S Electrical, and the National Fire Protection Association (NFPA) 70E Standard for Electrical Safety in the Workplace. Training certification shall be provided indicating each technician is a Qualified Person as defined by NFPA 70E. Training certifications shall be submitted to the VA Contracting Officer prior to work. If no training certifications are available, the contractor Employer shall certify that he/she has met this requirement in writing and submit it to the VA Contracting Officer prior to work. Contractors shall have ready access to the latest versions of the following references: NFPA 70, National Electrical Code. NFPA 70B, Recommended Practice for Electrical Equipment Maintenance. NFPA 70E, Standard for Electrical Safety for the Workplace. NFPA 110, Standard for Emergency and Standby Power System. OSHA Standard 29 CFR 1910, Subparts I & S. International Electrical Testing Association, Inc. (NETA) Maintenance and Testing Specifications. Operating /Maintenance manuals and specifications of the electrical equipment to be maintained and tested. These documents may be obtained from the Veterans Healthcare Administration( VHA) Medical Center, or the equipment manufacturers. VHA Directive 1028, Electrical Power Distribution System Contractors shall have and provide all necessary tools, equipment, and Personal Protective Equipment (PPE) to perform the work safely, effectively, and timely. Tools, equipment, and PPE shall comply with the requirements of OSHA Standard 29 CFR 1910, Subpart I, and NFPA 70E. Prior to initiating work, Contractor shall provide documentation that all instruments, test equipment, tools and PPE have current calibration. Dated calibration labels shall be visible on all instruments, test equipment, tools and PPE as appropriate. If a Scheduled/Approved outage would affect hospital operations, VA shall be able to reschedule with no contract modifications. 3. Summary of Work: The Contractor shall provide a proposed schedule with their bid proposal. The schedule shall be in the form of a progress chart of suitable scale to indicate the work scheduled for completion by any given date during the work period. The proposed schedule shall be reviewed by the VAMC Engineering Service; any requirements for adjusting the schedule (e.g. to minimize disruption to the VAMC) shall be incorporated by the Contractor. Contractors shall report deficiencies that are deemed critical or catastrophic immediately to the Contracting Officer and Chief of Engineering Service for immediate actions. Work items, definitions, and references shall comply with the latest edition of the NETA Maintenance Testing Specifications (MTS) and with the VHA Directive, Electrical Power Distribution System. Below is a list of electrical equipment that shall be maintained and tested: Switchgear and Switchboard Assemblies. Transformers, Dry Type, Air-Cooled, Low-voltage, Small. Transformers, Dry Type, Air-Cooled, Low-voltage, Large. Transformers, Liquid-Filled. Metal Enclosed Busways. Switches, Air, Low-Voltage. Switches, Air, Medium-Voltage, Metal-Enclosed. Circuit Breakers, Air, Insulated-Case/ Molded-Case. Circuit Breakers, Air, Low-Voltage Power. Circuit Breakers, Air, Medium-Voltage. Protective Relays, Mechanical, and Solid State. Protective Relays Microprocessor Based. Grounding Systems. Ground-fault Protection Systems. Motor Control, Motor Starters, Low-Voltage. Motor Control, Motor Starter, Medium-Voltage. Emergency Systems, Engine Generators. Emergency Systems, Automatic Transfer Switches. Distribution Panels Perform Arc-Flash Study/Labeling on all equipment requiring labels. Provide laminated, adhesive-backed flash and shock hazard/PPE signs for each system location will be provided and installed. Based on the results of the incident energy study, the supplier shall produce and install a warning label (orange 40 cal/cm2) for each piece of equipment in accordance with American National Standards Institute (ANSI) Z535.4-2002. The label must be readable in both indoor and outdoor environments for at least 3 years and contain the following information: Arc hazard boundary (inches) Working distance (inches) Arc flash incident energy at the working distance (calories/ cm2) PPE category and description including the glove rating Voltage rating of the equipment Limited approach distance (inches) Restricted approach distance (inches) Equipment/bus name Date prepared Supplier name and address Attachments. Government Furnished. Inventory of Electrical Power Distribution System equipment to be maintained, inspected, and tested under this Scope of Work. One-line and other informational drawings of the Electrical Power Distribution System. These drawings are not certified as-built drawings. Electrical Power System study information relevant to the scope of this effort, such as coordination study data, short-circuit analysis, arc-flash hazard analysis and available protective device setting information. 4-Hour Power Outage Test The Contractor shall be present for and will participate in the VAMC 4-hour test of the Essential Electrical System (EES). This test shall fulfill the requirements of VHA Directive, Electrical Power Distribution System, NFPA 110 (e.g. Para. 8.4.9.) and The Joint Commission. This test will include opening of all utility service connections serving the VAMC for a minimum of 4-hours. During the test period, verify operation of all EES components including the transfer to emergency power and return to normal service. The Contractor shall include in their bid proposal all costs associated with the services of the local utility company for the duration of the test. The estimated duration of the Contractor s involvement is between 8 12 hours. The Contractor shall assist the VAMC staff with troubleshooting and correcting malfunctioning electrical equipment discovered during the test. Contractor shall make any required adjustments and/or re-calibrations to all equipment which has been otherwise maintained, inspected, and tested under this Scope of Work. Deliverables: A. A complete written report of the work performed shall be provided to the VA within 7 days of completion. Information shown in the report shall be as following: Company s name, addresses, telephone, & FAX numbers. Name and signature of contractors who perform the maintenance and testing. VA Work Contract Number, name and number of VA Contracting Officer. Date and Time of work. Copies of contractors valid licenses, professional and training certificates. Descriptions and model number of specialized tools and equipment used, such as torque wrench or infra-red scanning camera. Location, Type, Name, and nameplate information of electrical equipment to be maintained and tested. Descriptions of work items. Test data. Reference materials such as equipment manufacturer s specifications, coordination study, etc. Remarks on conditions of electrical equipment. List all deficiencies, if any. Recommended corrective actions, if any. Submit four (4) hard copies of the complete written report to VA Contracting Officer within seven (7) calendar days of visit. C. Submit four (4) hard copies of the complete written report, and one (1) CD-ROM or DVD of the electronic version of the report in Microsoft Word format to the Chief of Engineering Service within seven (7) calendar days of visit. All reference materials shall be included in the electronic version of the report, either through scanning or other means of electronic text import methods. D. Drawings (Full-size for site, primary one-line diagram and secondary one-line diagrams) Use the latest version of AutoCAD (compatible with the local VAMCs version) and provide the viewer on each CD. For the Final Study Submittal, the VAMC shall receive live CADD drawing files which can be manipulated and updated. 5. Description / Specifications: The Contractor shall provide all management, supervision, labor, materials, supplies, repair parts, tools, instruments, and equipment, and travel expenses to provide the work and services specified in this contract. The Contractor shall plan, schedule, coordinate, and ensure effective and economical completion of all work and services specified in this contract. Most of the work will be accomplished at night and after the normal working hours. Normal working hours are 7:00 am to 4:30 pm ET Monday thru Friday. It may be possible to schedule some non-disruptive work during normal working hours. This Preventive Maintenance Inspection (PMI) is to be scheduled with the Contracting Officer Representative (COR). The PMI and any requested power outages must be scheduled a minimum of 2 weeks in advance. The specifications are a statement of the minimum level of work and services that are to be provided in certain areas under this contract. They are not intended to be, nor shall they be construed as, limiting specifications or requirements. At a minimum, the Contractor will be required to take all steps and measures, which would be taken by a prudent building owner to maximize the life expectancy of the property. All equipment at the facility shall be maintained at an acceptable level, throughout the contract performance period unless and until removed from the scope of work. An "acceptable level" of maintenance as defined as the level of maintenance which will preserve the equipment in unimpaired operating condition: i.e. above the point where deterioration will begin, thereby diminishing the normal life expectancy of the equipment. The Contractor shall maintain areas and storerooms in a clean and orderly manner. When work is performed in these areas, the Contractor's personnel shall clean up all debris and leave the area in a presentable condition. The Contractor must obtain the approval of the Electronics Shop Supervisor before storing anything in machinery space. Operating supplies such is lubricants, rags, and cleaners, etc. shall be properly secured in containers approved by the Electronics Shop Supervisor and stored in accordance with fire and safety requirements outlined in NFPA, Building Fire Safety Criteria. The Contractor shall coordinate all outages with Engineering Services. Prior to start of work, the Contractor must submit a complete schedule of all equipment being shut down, out/on time and affected departments/services. Contractor will give (2) two weeks to provide a schedule for both divisions. It shall be the responsibility of the Contractor to obtain permission from the local utility for main feeder outages. Any fees for such power outages or required permits shall be the Contractor's responsibility. 6. Scheduled Preventive Maintenance Requirements 1. All power outages for maintenance shall be scheduled during off-hours or weekends. Some work may be able to be accomplished during normal working hours and this work will be approved by the COR on a case-by-case basis. All maintenance shall be completed within 90 calendar days of contract start date. The Contractor shall submit a complete detailed maintenance schedule for approval to the Contracting Officer Representative (COR). The following specific criteria will be adhered to in addition to the above-mentioned General Scheduling requirements: a. All preventive maintenance scheduled for each period must be completed during that period. Requests by the Contractor for deviations from the approved schedule must be submitted with appropriate justification to the Electronics Shop Supervisor for approval. b. The Contractor shall coordinate the work with the COR, Facilities Management and shall immediately report the quantity and urgency for repair of any discrepancies found during the inspection. c. VAMC electricians will de-energize and re-energize circuits in accordance with the approved schedules. The Contractor will be responsible for establishing all required Lockout/Tag out (LO/TO) Procedures as required by OSHA, as well as verifying that systems are energized and de-energized. One (1) copy of the LO/TO procedures will be given to the COR. d. In accordance with the VHA Directive 1028, written procedures are established to prepare the medical center for a planned electrical outage. The procedures must consider the worst case of risk to patients, staff, visitors, and VHA property. When a planned electrical outage cannot be accomplished, the following requirements are mandatory for working on energized circuit: 1. Full and proper protective equipment (PPE) is available and worn by the qualified electricians. 2. Qualified electricians are provided with flame-retardant clothing for work at the proximity of energized electrical equipment. 3. Before initiating work, a specific work plan is developed, and a peer review of the plan documented. e. The work plan must include procedures to be used on and near the energized electrical equipment, barriers to be installed, safety equipment to be provided, and exit paths to be accessed. f. An Energized Circuit Work Permit must be obtained from the Chief of Engineering office. g. Contractor must submit a detailed list of all chemicals, planned to be used for this PMI, for approval. h. All workers (technicians and helpers) must have certification/documentation as evidence of their degree of Training and skill on the original equipment manufacturer before being allowed on work site. Worker s certification/documentation must be submitted at the time of offer. i. The VA will neither furnish personnel to assist the Contractor in accomplishing his work nor furnish tools or equipment for the inspections. j. The Contractor must review all high-pot testing procedures prior to performance, with the COR. k. The Contractor may be requested to perform emergency repair work on a continuous (including overtime) basis if circuits cannot be energized after inspection and maintenance have been accomplished in accordance with the contract. The VAMC via change order will arrange additional payment lot subsequent charges, separate purchase order, or credit card. 7. Procedures: At a minimum, the Contractor shall perform all manufacturers recommended testing and preventive maintenance on all listed equipment. Grounding and Connections: In accordance with VA Directive 1028, the contractor will test ground resistance for the entire facility grounding system to include but not limited to fall-of potential, induced frequency and clamp on testing. Fall of potential method is requested where soil is available to drive testing rods. Any measurements reading in excess of 25 ohms shall be immediately discussed with the COR. Where lightning protection systems are provided, the system must be certified in accordance with Underwriters Laboratories (UL) 96A standard. The Contractor shall check all grounding systems in accordance with National Electrical Code (NEC) and ANSI. The connections to buses, transformers, and contacts etc., the Contractor shall check for tightness and torque per manufacturers recommend

Source: SAM.gov, General Services Administration (public domain). BidTerrier shows public notices as published and cannot confirm that a notice is complete or current. Details can change, so always check the official notice. Nothing here says whether your business is eligible.