BidTerrierSign in

KAUTZ ROAD SUBSTATION CONSTRUCION, UIP SUBPROJECT 2- KRS

Energy, Department of

26 days leftSolicitationGeneral constructionElectrical
View the official notice at sam.gov

The official notice is always free. Read the full documents there before you bid.

Key facts

Closes
Dec 18, 2026, 5:00 PM ET (26 days left)
Place of work
Batavia, Illinois
Notice type
SolicitationA request for offers or bids. This is the notice you respond to.
Solicitation number
RFP-383167-CD
Office
FERMILAB - DOE CONTRACTOR
Posted
Nov 5, 2026
Codes
NAICS 237130 | PSC Z2MZ
Contact in the notice
Chris Daley, cdaley@fnal.gov
Source
SAM.gov Contract Opportunities

What this is

The U.S. Department of Energy is seeking a general contractor to rebuild and renovate the Kautz Road Substation, an UIP subproject. The substation supplies electricity to laboratory buildings and systems at Fermilab.

AI summary of the public notice. Check the official notice before you bid.

Report a problem with this summary How we use AI

Full summary

The full summary of this notice is for signed-in users

  • Who can bid
  • Key dates
  • What the work includes
  • How to respond
  • Requirements to watch for

A free account lets you read 3 full summaries a day and save one search with a daily email. The official notice stays free for everyone.

Similar open bids

  • 36C25227B0007 Remodel ENT Procedure Rooms CON 537-19-109

    Veterans Affairs, Department of · Chicago, Illinois

    2 days leftPresolicitationService-disabled veteran-owned small business set-aside

    Closes Nov 24, 2026, 11:00 AM ET

    The Department of Veterans Affairs is planning a construction project to remodel ENT procedure rooms at the Jesse Brown VA Medical Center in Chicago, Illinois. This is a presolicitation notice, and it is not yet a request for bids or other submissions.

  • Thomas J O Brien Lock and Dam Major Rehabilitation - Construction, Chicago, Cook County, Illinois

    Dept of Defense · Illinois

    5 days leftSources sought

    Closes Nov 27, 2026, 3:00 PM ET

    The U.S. Army Corps of Engineers, Chicago District, is conducting a sources sought market survey for major rehabilitation construction at the Thomas J O Brien Lock and Dam. This is not a request for proposals, but the information may support a future competitive contract for Phase 2 work.

  • Investigation, Repairs, and Removal and Disposal of Marine Attachments to Raw Water Intake

    Dept of Defense · Great Lakes, Illinois

    8 days leftSources sought

    Closes Nov 30, 2026, 2:00 PM ET

    The Department of Defense, Department of the Navy is conducting a sources sought notice, not a bid request. It seeks small business firms able to investigate and repair the raw water intake and remove and dispose of Zebra Mussels and marine deposits at Naval Station Great Lakes.

  • Repair Building Systems (Peoria, IL)

    Agriculture, Department of · Peoria, Illinois

    10 days leftCombined synopsis and solicitationSmall business set-aside

    Closes Dec 2, 2026, 1:00 PM ET

    The U.S. Department of Agriculture, Agricultural Research Service is requesting quotations to repair various building systems at the National Center of Agricultural Utilization Research in Peoria, Illinois. This is a combined synopsis and solicitation, and no separate written solicitation will be issued.

  • Commercial Gear Backup Power (CGBP) and Control System Improvements at Fish Barrier

    Dept of Defense · Illinois

    10 days leftSources sought

    Closes Dec 2, 2026, 2:00 PM ET

    The U.S. Army Corps of Engineers, Chicago District, is conducting a sources sought notice to find firms that can upgrade backup power, switchgear controls, and automation systems at an electronic fish barrier. The work is intended to improve reliable operation and help prevent invasive aquatic species from moving between the Great Lakes and Mississippi River basins. This is market research, not a request for proposals.

More general construction bids

Recent awards from Energy, Department of

Award notices this agency published, as listed by the source.

Original description from the notice

November 5, 2026- Amendment 1 issued to clarify timne and location of the Pre-Proposal Meeting. This scope of work is to rebuild and renovate the Kautz Road Substation (KRS), which is UIP subproject SP-2. The KRS supplies electricity to various lab buildings and systems. These systems serve both conventional facility needs, as well as process utility requirements. It is vital to Fermilab’s mission that KRS be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 - 60 Calendar Days after issuance of Notice to Proceed (NTP). This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 - 4th January 2028; This milestone marks the point where access is permitted inside Kautz Road Substation yard and construction work may begin. Milestone 3 - 31st of March 2028; This milestone marks the completion of building foundation and ready for placement of the new prefabricated control house building (provided by FermiForward). Milestone 4 - 2nd July 2029; This milestone marks the formal issuance of an Authorization for Use and Possession (AUP) of the KRS Substation facility, including all remedial work following removal of site trailers, but not including seasonal work and all final punch list items addressed.. Milestone 5 - 30th September 2029; This milestone marks the completion of the project.

Source: SAM.gov, General Services Administration (public domain). BidTerrier shows public notices as published and cannot confirm that a notice is complete or current. Details can change, so always check the official notice. Nothing here says whether your business is eligible.