BidTerrierSign in

Modernize Regenerative Thermal Oxidizer (RTO)

Treasury, Department of the, Bureau of Engraving and Printing

3 days leftSources soughtGeneral constructionHVAC
View the official notice at sam.gov

The official notice is always free. Read the full documents there before you bid.

Key facts

Closes
Nov 25, 2026, 4:00 PM ET (3 days left)
Place of work
TX - Texas, Texas
Notice type
Sources soughtThe agency is checking which businesses could do the work. It is not a request for a bid.
Solicitation number
2031ZA27B00001
Office
OFFICE OF THE CHIEF PROCUREMENT OFFICER
Posted
Nov 18, 2026
Codes
NAICS 238220 | PSC Z2AZ
Contact in the notice
LaQulla Williams, laqulla.williams@bep.gov
Source
SAM.gov Contract Opportunities

What this is

The Bureau of Engraving and Printing (BEP) is looking for companies that can upgrade a Regenerative Thermal Oxidizer (RTO) and its ventilation system at their Western Currency Facility (WCF). This is a sources sought notice to gather information from potential sources.

AI summary of the public notice. Check the official notice before you bid.

Report a problem with this summary How we use AI

Full summary

The full summary of this notice is for signed-in users

  • Who can bid
  • Key dates
  • What the work includes
  • How to respond

A free account lets you read 3 full summaries a day and save one search with a daily email. The official notice stays free for everyone.

Similar open bids

  • Market Intelligence Notice: Fort Hood Bldg 410 General Stilwell Army Reserve Center (ARC)

    Dept of Defense · Fort Hood, Texas

    2 days leftSources sought

    Closes Nov 24, 2026, 5:00 PM ET

    This is a sources sought notice from the U.S. Army Corps of Engineers, Louisville District, for market research. The project would design, repair, restore, and modernize Building 410, the General Stilwell Army Reserve Center at Fort Hood, Texas, and related parking and utilities.

  • Flooring Replacement Services CTXVA

    Veterans Affairs, Department of · Temple, Texas

    3 days leftSolicitationService-disabled veteran-owned small business set-aside

    Closes Nov 25, 2026, 10:00 AM ET

    Department of Veterans Affairs posted a solicitation titled "Flooring Replacement Services CTXVA". Place: Temple, Texas. Responses are due Nov 25, 2026, 10:00 AM ET. The listing has little detail. Read the official notice for the full scope.

  • FCI Three Rivers-Replace Generators, Transformers, and Electrical Infrastructure

    Justice, Department of · Three Rivers, Texas

    8 days leftCombined synopsis and solicitation8(a) program (competed)

    Closes Nov 30, 2026, 11:00 AM ET

    The Federal Bureau of Prisons is requesting quotes for a firm-fixed-price construction project at FCI Three Rivers. The work will replace generators, transformers, and electrical infrastructure at the facility.

  • FCI Bastrop - Remove and Replace Housing Unit Roofs (10) 27Z5BB3

    Justice, Department of · Texas

    8 days leftSources sought

    Closes Nov 30, 2026, 2:00 PM ET

    This is a market research notice from the Federal Bureau of Prisons. The Federal Correctional Institution (FCI) Bastrop in Texas wants to find out if companies can replace the roofs on 10 housing unit buildings. The notice is asking for information only, not for bids yet.

  • FOR THE CONSTRUCTION OF THERMOPLASTIC STRIPING, Eastland County (Various)

    Texas Department of Transportation · Texas

    9 days leftSolicitation

    Closes Dec 1, 2026, 1:00 PM CT

    Texas Department of Transportation posted a solicitation titled "FOR THE CONSTRUCTION OF THERMOPLASTIC STRIPING, Eastland County (Various)". Place: Texas. Responses are due Dec 1, 2026, 1:00 PM CT. The listing has little detail. Read the official notice for the full scope.

More general construction bids

Original description from the notice

SEEKING SOURCES ONLY - The Bureau of Engraving and Printing (BEP) Western Currency Facility (WCF) is located at 9000 Blue Mound Road, Fort Worth, TX, 76131. Construction began on the WCF in 1987 and was completed in 1989. The Modernized Regenerative Thermal Oxidizer (RTO) is an air pollution control device that is required by the NSR (New Source Review) Air Permit issued by the TCEQ (Texas Commission on Environmental Quality) to treat Volatile Organic Compounds (VOC) emissions from Plate Printing presses (14), Offset presses (4), and Rotary Screen presses (4). The existing RTO was commissioned in 2010 to control VOC emissions from Plate Printing. In 2021, the Offset presses were added to the RTO system. The existing conveyance system, which currently includes ducting from each press to the roof, nine (9) roof fans, and a 48" main duct on the roof, has been in place since the facility was built in the early 90s. The system has been cobbled together as presses were added in Plate Printing, which originally only housed four (4) presses, without consideration for the wholistic efficiency of the system. It is a requirement of the Clean Air Act, EPA regulations, and the WCF air permits, that an air pollution control device associated with a "facility" (equipment or area that is emitting air pollutants as defined by EPA) must be maintained in good condition and operated properly while the attached "facilities" operate. This design/build project shall replace the RTO and the associated exhaust ventilation system: a new RTO with a modern control panel including safe PLCs and lower working voltage, a properly designed exhaust ventilation system that self-optimizes with feedback from modern performance-monitoring systems, properly sized roof fans, accessibility to clean ducting where needed, and increased voe capture efficiency to better exhaust printing areas while allowing the RTO to operate using less supplemental fuel. The new system shall also incorporate features to decrease the amount of ink and oils that get conveyed into the exhaust ventilation system causing air flow issues and damaging ducting, fans, and other system components. Natural gas usage of the new RTO shall be metered and integrated into the BEP Supervisory Control And Data Acquisition (SCADA) system. In 2025, the existing RTO underwent several upgrades including the installation of a new, modern control panel to address obsolete components and increasingly difficult troubleshooting. This project shall set the Western Currency Facility (WCF) up for success in providing operational redundancy alongside the newly overhauled RTO that is currently operating at the facility. The entire voe exhaust ventilation system shall feed into one of two RTOs (existing or new) with the capability to divert process flow from one RTO to the other in the event one RTO shuts down for any reason. This redundancy shall enable production to continue operating while the root cause of the issue is addressed.

Source: SAM.gov, General Services Administration (public domain). BidTerrier shows public notices as published and cannot confirm that a notice is complete or current. Details can change, so always check the official notice. Nothing here says whether your business is eligible.