BidTerrierSign in

Request for Information/Market Intelligence Notice: Repair Electrical Distribution System Switchgear Stations & Addition of Redundancy Cable Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA)

Dept of Defense, Dept of the Air Force

9 days leftSources soughtGeneral constructionElectrical
View the official notice at sam.gov

The official notice is always free. Read the full documents there before you bid.

Key facts

Closes
Nov 30, 2026, 10:00 AM ET (9 days left)
Place of work
Bolling AFB, District of Columbia
Notice type
Sources soughtThe agency is checking which businesses could do the work. It is not a request for a bid.
Solicitation number
FA706027R0001
Office
FA7060 11TH CONTRACTING SQ PK
Posted
Oct 23, 2026
Codes
NAICS 238210 | PSC Z2JZ
Contact in the notice
Terry Agena, terry.agena.1@us.af.mil
Source
SAM.gov Contract Opportunities

What this is

The Department of the Air Force is seeking market information for repairs and upgrades to electrical switching stations B18 and B168 at Joint Base Anacostia-Bolling. The work may use Progressive Design-Build with an Other Transaction agreement, but this is an early information notice, not a solicitation or request for proposals.

AI summary of the public notice. Check the official notice before you bid.

Report a problem with this summary How we use AI

Full summary

The full summary of this notice is for signed-in users

  • Who can bid
  • Key dates
  • What the work includes
  • How to respond
  • Requirements to watch for
  • Size or quantity stated

A free account lets you read 3 full summaries a day and save one search with a daily email. The official notice stays free for everyone.

Similar open bids

  • Construction Services for the Gate 7 Parking Garage St. Elizabeths West Campus

    General Services Administration · Washington, District of Columbia

    2 days leftSolicitation

    Closes Nov 23, 2026, 4:00 PM ET

    The General Services Administration, Public Buildings Service, is seeking construction services for a new Gate 7 Parking Garage at the St. Elizabeths West Campus. The project will support the operational needs of the U.S. Department of Homeland Security and includes related campus, utility, security, stormwater, landscape, and infrastructure improvements.

  • Multiple Award Construction Contract (MACC)

    Dept of Defense · Bolling AFB, District of Columbia

    9 days leftSources sought

    Closes Nov 30, 2026, 4:00 PM ET

    The Department of the Air Force is seeking information from businesses for a possible Multiple Award Construction Contract program. The work could cover design, maintenance, repair, renovation, additions, upgrades, and other construction at Joint Base Anacostia Bolling and Andrews AFB. This is a sources sought notice, not a solicitation for proposals, and no contract will be awarded from this notice.

  • REQUEST FOR INFORMATION (RFI) for a Vessel Construction Manager (VCM)

    Transportation, Department of · Washington, District of Columbia

    17 days leftSources sought

    Closes Dec 8, 2026, 5:00 PM ET

    This is a Request for Information (RFI) from the Maritime Administration. They are planning a future solicitation for a Vessel Construction Manager and the construction of up to four new sealift vessels. The goal is to find interested companies before the official solicitation is released.

  • Garage Drywall Demolition at Udall Building

    Interior, Department of the · District of Columbia

    20 days leftCombined synopsis and solicitationSmall business set-aside

    Closes Dec 11, 2026, 12:00 PM ET

    The Department of the Interior is requesting quotes for garage drywall demolition and related construction work at the Stewart Lee Udall Building. This is a combined synopsis and solicitation, so no separate written solicitation will be issued.

  • Cooling Tower, Roofing, and Structural Construction

    Treasury, Department of the · District of Columbia

    20 days leftSolicitationSmall business set-aside

    Closes Dec 11, 2026, 1:00 PM ET

    The Bureau of Engraving and Printing, part of the U.S. Department of the Treasury, is seeking proposals for cooling tower, roofing, and structural construction. This is a solicitation for work covered by the updated Statement of Work and attachments.

More general construction bids

Recent awards from Dept of Defense

Award notices this agency published, as listed by the source.

Original description from the notice

REQUEST FOR INFORMATION (RFI) / MARKET RESEARCH NOTICE: This is a request for information (RFI) for market intelligence and for informational purposes only. This announcement does not constitute a solicitation or a request for proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm’s ability to submit a proposal should formal solicitation be issued in the future. NAICS CODE: 238210 Electrical Contractors and Other Wiring Installation Contractors SMALL BUSINESS STANDARD: $19,000,000.00 NOTE: While Other Transaction Authority is not subject to FAR based small business regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base. PROGRAM/PROJECT OVERVIEW: The 11th Contracting Squadron (11 CONS), District of Washington, has a requirement to execute the design-build upgrades, repairs, and/or replacements to the deteriorated Electrical Switching Stations located at B18 and B168 on Joint Base Anacostia Bolling (JBAB) that includes developing a solution to establish a connection by high voltage electrical redundancy cable. The Government is evaluating the feasibility of executing these requirements via Progressive Design-Build (PDB) utilizing an Other Transaction (OT) Agreement under the statutory authority of 10 U.S.C. § 2808a. This project summary establishes the operational requirements, technical baseline, and acquisition framework for the Progressive Design-Build (PDB) Other Transaction Authority (OTA) effort to modernize Joint Base Anacostia-Bolling’s (JBAB) primary electrical infrastructure. Project Title JBAB Electrical Switching Stations (ESS B18 & B168) Modernization & Grid Redundancy Location Joint Base Anacostia-Bolling (JBAB), 11th Wing Acquisition Strategy Progressive Design-Build (PDB) via Other Transaction Authority (OTA) Primary Objective Engineer comprehensive design packages to repair, upgrade, and interconnect deteriorated electrical switching infrastructure Primary Deliverables 100% executable design packages, specifications, and implementation schedules for ESS upgrades, facility hardening, cable routing, and smart-grid wireless SCADA/telemetry Scope Breakdown by Facility & Component ESS B18 (Switching Station Upgrade) • Full replacement of legacy switchgear with FR3 fluid, air-insulated switchgear (per latest UFC 3-550-01) • Life-cycle cost and sustainability integration (UFC 1-200-02) • Thermal partition separating switchgear room from power generation bay • Dedicated HVAC system and air conditioning ductwork • Sized space heating units • High-efficiency interior LED lighting ESS B168 (Repair, Upgrade & Hardening) • Complete switchgear replacement mirroring ESS B168b using FR3 air-insulated switchgear (UFC 3-550-01) • Sustainable design practices (UFC 1-200-02) • Dedicated single HVAC unit and duct system • Interior/exterior high-efficiency LED flood/task lighting • Raised roof profile with comprehensive crack sealing/insulation • Foundation pillar repairs, crawl space waterproofing, and rainwater gutter system • Motorized roll-up door, cyber/physical cypher-locked access doors, and motorized loading dock ramp with widened sidewalk High-Voltage Redundancy Cables • Design 4-circuit bidirectional interconnect (8 cables total) connecting ESS B18 and ESS B168 • Baseline routing derived from 2025 Engineering Study • Mandatory underground routing preference across base footprint • Aerial routing permitted strictly as secondary exception where subsurface obstructions prevent underground installation Wireless SCADA & Grid Telemetry • Air Force long-term smart-grid wireless connectivity architecture • Cell-enabled control panels reporting directly to electric shop web interface without physical comm trunk lines • Relay-to-control panel comm wiring for ESS B18 and ESS B168 • Additional telemetry control panel integrated into ESS B4505 (sub-station to B18) to monitor sub-station power load profiles Key Technical Standards & Compliance Baseline UFC 3-550-01 Exterior Electrical Power Distribution Mandates modern FR3 biodegradable, fire-resistant fluid dielectric air-insulated switchgears, significantly mitigating environmental and thermal hazards. UFC 1-200-02 High Performance and Sustainable Building Requirements Governs energy efficiency, life-cycle cost effectiveness, indoor environmental quality, and durable materials integration. PDB / OTA Authority Prototype / Collaboration Framework Fosters early contractor involvement during Phase 1 design, mitigating unforeseen site and subsurface risk prior to Phase 2 construction commitment. INFORMATION REQUESTED: Interested industry partners are requested to respond to the following questions to help shape the final acquisition strategy: Company Profile: Q1. Business Name Q2. Address Q3. Point of Contract (Name, Title) Q4. Phone Number Q5. Email Address Q6. Unique Entity ID Q7. Cage Code Q8. Socioeconomic Status (Other Than Small, Small, 8(a), SDVOSB, etc.) Q9. Participating Role (Prime Contractor, Subcontractor, Design Firm, Other) Other Transaction Authority (OTA) & Statutory Compliance: Q10. OTA Experience - Describe your firm’s previous experience, if any, executing projects utilizing OTA. Q11. What project characteristics make PDB OTA particularly advantageous or disadvantageous for this requirement? Progressive Design-Build (PDB) / Early Contractor Involvement: Q12. What minimum level of detail (e.g., Statement of Need, conceptual site plans, target budget) does your firm require prior to entering Phase 1 (Design/Pre-construction) to feel confident in the project's viability? Q13. What collaborative mechanisms (such as joint design charrettes, target-value design workshops, or phased scoping approvals) do you recommend the Government implement in the first 30-90 days to rapidly transition from a "blank page" to a mutually agreed-upon baseline? Q14. Describe your experience executing Progressive Design-Build, Construction Manager at Risk (CMAR), or other highly collaborative delivery methods where designer and builder worked collaboratively with the owner before locking in a Guaranteed Maximum Price (GMP). Feedback on the Acquisition Strategy & Alternatives: Q15. Does the proposed PDB-OTA strategy incentivize your firm to participate? Why or why not? Q16. Are there alternative acquisition strategies, commercial phasing arrangements, or risk-sharing terms that the Government has not considered that would yield a higher quality facility, faster delivery, or lower cost? Bonding Capability: Q17. Specify your maximum bonding (single and aggregate) as a sole prime contractor and/or as a joint venture. SUBMISSION INSTRUCTIONS: Please submit your responses by 30 November 2026 at 1000 Eastern Standard Time (EST) to Mr. Terry Agena at terry.agena.1@us.af.mil and MSgt Quortez Dorsey quortez.dorsey@us.af.mil. The Government welcomes candid industry feedback and recommendations regarding commercial practices, agreement terms, project phasing, risk sharing, governance, pricing approaches, and other considerations that could improve successful execution of these projects under 10 U.S.C. § 2808a. Interested firms are encouraged to add themselves to the Interested Vendors List associated with this announcement on SAM.gov to receive future updates. Note: Do not submit proprietary trade secrets, protected technologies, or classified information in your response. All feedback received will be handled as public market research to shape the Government's final acquisition approach.

Source: SAM.gov, General Services Administration (public domain). BidTerrier shows public notices as published and cannot confirm that a notice is complete or current. Details can change, so always check the official notice. Nothing here says whether your business is eligible.