ROD,WELDING
Dept of Defense, Dept of the Navy
The official notice is always free. Read the full documents there before you bid.
Key facts
- Closes
- Dec 1, 2026, 3:30 PM ET (9 days left)
- Place of work
- Location not stated
- Notice type
- SolicitationA request for offers or bids. This is the notice you respond to.
- Solicitation number
- N0010426QFC91
- Office
- NAVSUP WEAPON SYSTEMS SUPPORT MECH
- Posted
- Nov 17, 2026
- Codes
- NAICS 333992 | PSC 3439
- Contact in the notice
- Telephone: 7176053354, amanda.l.bailey50.civ@us.navy.mil
- Source
- SAM.gov Contract Opportunities
What this is
A plain-English summary has not been written for this notice yet. The facts above come straight from the notice, and the original description is further down this page.
Similar open bids
EXPANSION JOINT
Dept of Defense · Location not stated
Closes tomorrowSolicitationSmall business set-asideCloses Nov 23, 2026, 3:00 AM ET
BROOMFIELD COIL WINDING MACHINE
Dept of Defense · Portsmouth, Virginia
Closes tomorrowCombined synopsis and solicitationSmall business set-asideCloses Nov 23, 2026, 8:00 AM ET
Dept of Defense posted a combined synopsis and solicitation titled "BROOMFIELD COIL WINDING MACHINE". Place: Portsmouth, Virginia. Responses are due Nov 23, 2026, 8:00 AM ET. The listing has little detail. Read the official notice for the full scope.
ODMS-GASKET, ODMS-KIT GASKET
Homeland Security, Department of · Location not stated
Closes tomorrowCombined synopsis and solicitationCloses Nov 23, 2026, 9:00 AM ET
STRAINER SEDIMENT
Homeland Security, Department of · Location not stated
Closes tomorrowCombined synopsis and solicitationCloses Nov 23, 2026, 10:00 AM ET
NOZZLE FUEL INJECTION
Homeland Security, Department of · Location not stated
Closes tomorrowCombined synopsis and solicitationCloses Nov 23, 2026, 10:00 AM ET
Recent awards from Dept of Defense
Award notices this agency published, as listed by the source.
- Dept of Defense · awarded Nov 23, 2026 · US$983,096 · to SPARTACRAFT INC 7690 SPARTA CRAFT DR Connelly Springs NC 28612 USA
- Dept of Defense · awarded Nov 20, 2026 · US$350,000 · to ARIZONA AERO FASTENERS, INC
- Dept of Defense · awarded Nov 20, 2026 · US$502,500 · to TREADWELL CORPORATION (DELAWARE)
- Dept of Defense · awarded Nov 20, 2026 · US$350,000 · to KAREN CARLISLE
Original description from the notice
CONTACT INFORMATION|4|N743.49|WVL|771-229-0573|benjamin.t.spangler.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|See specification sections C and E.| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8||||||||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material |N/A|TBD|N00104|TBD|N39040 - Certifications, S4306A - Material |N50286|TBD|133.2|N/A|N/A|N39040 - Certifications |N/A |N/A|SEE DD FORM 1423 |PORT_PTNH_WAWF_NOTIFICATION@NAVY.MIL BENJAMIN.T.SPANGLER.CIV@US.NAVY.MIL| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery.|One year from date of delivery.||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(FEB 2026))|2||| WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEV 2026-O0037)(FEB 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| 1. The offer due date is updated to 1 December 2026. 2. The quantity is updated to 16. \ 1. The offer due date is updated to 09 July 2026. 2. The POC is updated to Amanda Bailey amanda.l.bailey50.civ@us.navy.mil. 3. The Small Business Set-Aside is hereby dissolved. \ 1.DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 2. Portsmouth NSY's DODAAC has changed from N00102 to N50286. Any reference toN00102 within this order should be updated to N50286. 3. The following proposed delivery schedule applies: Submission of Certification Data CDRLs will be on or before 20 days prior to scheduled delivery. PNSY review/acceptance of Certification CDRLs 6 working days after receipt of Certification DD 1423 CDRLs. Final delivery of material will be on or before 365 days after effective date of the resulting contract. 4. Any contract awarded as a result of this solicitation will be "DO" rated order; "DO" rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). 5. This order is issued pursuant to Emergency Acquisition Flexibilities (EAF). \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2.2 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=T9074-BC-GIB-010/0200 | | | |021211|A| | | DOCUMENT REF DATA=T9074-BD-GIB-010/0300 | | |2 |121218|A| | | 3. REQUIREMENTS 3.1 Manufacture and Design - The item furnished under this Contract/Purchase Order must meet the requirements as specified in T9074-BC-GIB-010/0200, except as amplified or modified herein. T9074-BC-GIB-010/0200 and Appendix B ordering data information is provided below: (a) FILLER MATERIALS FOR CRITICAL APPLICATIONS: REQUIREMENTS FOR FLUX-CORED WELDING ELECTRODES, BARE WELDING ELECTRODES AND FLUXES, AND COVERED WELDING ELECTRODES FOR LOW-ALLOY STEEL APPLICATIONS; T9074-BC-GIB-010/0200. (b) ELECTRODES AND RODS, WELDING, BARE, SOLID, OR ALLOY CORED; AND FLUXES, LOW ALLOY STEEL; Appendix B (c) Dates and revisions of specifications and standards referenced herein must be as specified in Paragraph 2 of this Contract/Purchase Order. (d) An Asbestos free certificate of compliance is not required. (e) Additional 'burn' testing of plastic spools is not required. (f) Alloy Identity testing after marking is not required. (g) Alternate restraint methods other than fixturing or strongboards are not permissible. (h) Specific alloy identity testing is not required. (i) Check tolerances for Chemical Composition and Mechanical Properties will not be used. (j) Level of Preservation, Packing, and packaging must be as specified elsewhere in the Contract/Purchase Order. Appendix B: (a) ELECTRODES AND RODS, WELDING, BARE, SOLID, OR ALLOY CORED; AND FLUXES, LOW ALLOY STEEL; Appendix B (b) Type - ;MIL-120S-1; Form - ;N/A; Size - ;1/16; Spool Weight - ;25; (c) Quality conformance testing in the stress-relieved condition is required for MIL-100S-2SR electrodes/rods only. (d) For Electrodes with the SR suffix, hold at the stress relief temperature for 1 hour per inch of weld thickness; for weld thicknesses less than 1 inch the minimum hold time must be proportional to the weld thickness but must not be less than 30 minutes. (e) Length - ;N/A; (f) Copper content restriction is not required. (g) Maximum Chromium content of 0.05% is required to control hexavalent chromium in welding fumes. (h) The minimum and maximum allowable yield strength for MIL-120S electrodes is 100ksi and 125ksi respectively. (i) Stress relief thermal treatment of welds deposited with MIL-120S-1 or MIL-120S-2 electrodes or rods is not permitted. (j) Brand Name electrode and flux combinations used for conformance testing of MIL-120S electrodes are not required. (k) HSLA-80 and HSLA-100 steel conforming to NAVSEA Technical Publication T9074-BD-GIB-010/0300 is not permitted. (l) Electrode sizes 0.035 inches and smaller must be tested at a minimum heat input of 55kJ/in for the low cooling rate condition. (m) The GTAW process is not applicable. (n) The base metal steel used for testing in the stress relieved condition must be as specified in NAVSEA Technical Publication T9074-BD-GIB-010/0300 (o) Level of preservation, packaging, and packing must be as specified elsewhere in the contract/purchase order. (p) A second test weldment is not required for quality conformance testing in the as-welded condition. (r) The shielding gas options for GMAW are as referenced by Table XI, note 3/; Table XII, note 3/; and Table XIII, note 3/. (s) A second test weldment is not required for using ASTM A710 or NAVSEA Technical Publication T9074-BD-GIB-010/0300 grade HSLA-80 steel base material. 3.2 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing (if any) per applicable specifications is still required, but certifications are only required as listed below. Test - Quality Conformance/Compliance Inspection Item - ;Welding Rod; Performance - ;T9074-BC-GIB-010/0200; Acceptance - ;T9074-BC-GIB-010/0200; 3.3 Welding Electrode Strip Heaters - Electrical resistance rod-type or pad-type heaters (i.e. strip heaters) that are controlled automatically by thermocouples or manually by an on-off switch must be used to maintain preheat/interpass temperatures within the required range before and during welding of the usability (i.e. soundness) test plate and the mechanical property (when required) test plate. The test plate must be insulated or separated from the work bench. OXY-FUEL heating of any test plate is not permitted. 3.3.1 Holding fixture - During welding, the mechanical property test plate must be held in place by a fixture built in accordance with "HOLDING FIXTURE FOR MECHANICAL PROPERTY TEST PLATES", (CSD005 in the ECDS (Electronic Contractor Data Submission) system at: https://register.nslc.navy.mil/) The strip heaters required above must be placed against the back side of the test plate, between the test plate and the base plate of the test fixture. The length and width of the test plate must be dimensioned so as to be adequately held in place by the fixture. 3.4 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. 3.5 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government inelectronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.5.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to theoperational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.5.2 Requests for Waivers/Deviations for NAVSUP-WSS Contracts must be submitted using the ECDS (Electronic Contractor Data Submission) system at https://register.nslc.navy.mil/ 3.5.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of theproduct. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineeringchange. 3.6 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.7 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further application of the above documents is prohibited.prohibited. 3.7.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.8 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.8.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.8.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.8.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement. 3.8.4 This contract provides for the performance of Government Quality Assurance at destination. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. 3.8.5 Any changes made by the Contractor to a qualified quality system will require re-submittal to the PCO. 3.9 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected. 3.9.1 The supplier's gages, measuring and test equipment must be made available for use by the Government when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.9.2 All documents and reference data applicable to this contract must be available for review by the Government. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government. 3.10 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Prime Contractor who will notify the PCO so that appropriate planning for Government inspection can be accomplished. 3.10.1 The prime contractor's program must include procedures to assess the capability of the prospective suppliers to produce the products or supply the services in accordance with the contract, prior to the issuance of any purchase document. 3.10.2 Each sub-tier supplier of material or services for items in Section 3 of this contract must be subjected to a periodic review or audit by the Prime to determine the continued capability of the supplier to control the quality of the products or services specified in the purchase order or contract. 3.10.3 The prime contractor must ensure that the purchased product conformsto specified purchase requirements and this contract. The type and extent of control applied to the supplier and the purchased product must be dependent upon the effect of the purchased product on the end item represented by this contract. 3.10.4 The prime contractor must evaluate the requirements of the contractand select suppliers based on their ability to supply the product in accordance with the prime contractor's requirements and the contract. Criteria for selection and evaluation must be established. Records of this effort must be available for review by the government. 3.10.5 The prime contractor's supplier quality assurance program must provide for a review of purchase documents to assure applicable quality requirements are included or referenced in the documentation for compliance by the supplier. 3.11 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.11.1 Visual examination upon receipt to detect damage during transit. 3.11.2 Inspection for completeness and proper type. 3.11.3 Verification of material quality received. 3.11.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. 3.11.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. 3.11.6 Identification and protection from improper use or disposition. 3.11.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuit
Source: SAM.gov, General Services Administration (public domain). BidTerrier shows public notices as published and cannot confirm that a notice is complete or current. Details can change, so always check the official notice. Nothing here says whether your business is eligible.