BidTerrierSign in

Ross Springs Waterline Replacement

Agriculture, Department of, Forest Service

9 days leftCombined synopsis and solicitationSmall business set-asideGeneral constructionPlumbing
View the official notice at sam.gov

The official notice is always free. Read the full documents there before you bid.

Key facts

Closes
Dec 1, 2026, 5:00 PM ET (9 days left)
Place of work
Utah
Notice type
Combined synopsis and solicitationA short announcement and the request for offers in one notice.
Set-aside
Small business set-asideA set-aside limits who may compete. The notice states the exact rules.
Solicitation number
1240LT27Q0022
Office
ASHLEY NATIONAL FOREST
Posted
Nov 10, 2026
Codes
NAICS 237110 | PSC Z2NE
Contact in the notice
Derrick A Dodson, derrick.dodson@usda.gov
Source
SAM.gov Contract Opportunities

What this is

The U.S. Department of Agriculture, Forest Service is seeking a contractor for the Ross Springs Waterline Replacement project. The work will replace an abandoned 4-inch asbestos cement pipe with a 4-inch HDPE water main and related parts.

AI summary of the public notice. Check the official notice before you bid.

Report a problem with this summary How we use AI

Full summary

The full summary of this notice is for signed-in users

  • Who can bid
  • Key dates
  • What the work includes
  • How to respond
  • Requirements to watch for
  • Size or quantity stated

A free account lets you read 3 full summaries a day and save one search with a daily email. The official notice stays free for everyone.

Similar open bids

  • Clearfield Job Corps Center Design-Build (D-B) Roof & HVAC Replacement

    Labor, Department of · Clearfield, Utah

    2 days leftSources soughtSmall business set-aside

    Closes Nov 24, 2026, 2:00 PM ET

    The U.S. Department of Labor, Office of Job Corps Acquisition Services, is conducting market research for design-build services at the Clearfield Job Corps Center. The work would replace the roof and roof HVAC systems and add seismic upgrades to Automotive Building E9. This is a sources sought notice, not a bid request or solicitation.

  • Dugway Proving Ground (DPG) Horizontal Facility Construction Road Maintenance

    Dept of Defense · Dugway, Utah

    2 days leftSolicitation8(a) program (competed)

    Closes Nov 24, 2026, 3:00 PM ET

    The U.S. Army is seeking miscellaneous paving construction services at Dugway Proving Ground. This is an indefinite-delivery, indefinite-quantity contract, with work issued through task orders.

  • UT NP ARCH 100(2) Bridges on Delicate Arch Road

    Transportation, Department of · Moab, Utah

    9 days leftSolicitation

    Closes Dec 1, 2026, 4:00 PM ET

    The Federal Highway Administration is requesting bids for the reconstruction of Delicate Arch Road in Arches National Park. The project will build three bridges, improve drainage and flooding conditions, raise and realign parts of the road, and repave roadway and parking areas.

  • HAFB Multiple Award Construction Contract V (MACC V)

    Dept of Defense · Utah, Wyoming

    17 days leftSolicitationSmall business set-aside

    Closes Dec 9, 2026, 5:30 PM ET

    This is a solicitation for an IDIQ, total small-business set-aside construction contract for multiple sites at Hill AFB, UT and nearby facilities. Work includes real property maintenance, repair, alteration, and new construction. Each project will be a separate task order under the basic contract.

  • GAOA Tony Grove Dam Spillway Capacity & Seismic Mitigation, Uinta/Wasatch/Cache National Forest

    Agriculture, Department of · Garden City, Utah

    22 days leftCombined synopsis and solicitationSmall business set-aside

    Closes Dec 14, 2026, 7:00 PM ET

    The U.S. Department of Agriculture, Forest Service is requesting quotes for commercial construction at Tony Grove Dam on the Uinta/Wasatch/Cache National Forest. The project will improve the dam spillway capacity and seismic safety.

More general construction bids

Recent awards from Agriculture, Department of

Award notices this agency published, as listed by the source.

Original description from the notice

This project includes the replacement of 4” asbestos cement pipe (abandoned in place) with 4” HDPE water main and associated valves and connections to laterals. The work includes; Installation of 4450 linear feet of 4” HDPE pipeline, most of which will be shallow bury or laid on cleared ground and covered with imported fill from a government source. Cover an additional 1150 linear feet of existing pipeline with imported fill from a government source. Installation of 2 combination air-vacuum valves with utility boxes. Installing associated valves, daylight drains, and pumpout drains; and connecting to existing lateral mains and services.

Source: SAM.gov, General Services Administration (public domain). BidTerrier shows public notices as published and cannot confirm that a notice is complete or current. Details can change, so always check the official notice. Nothing here says whether your business is eligible.