BidTerrierSign in

VALVE,RESTRICTOR CH

Dept of Defense, Dept of the Navy

9 days leftSolicitationIndustrial parts and hardware
View the official notice at sam.gov

The official notice is always free. Read the full documents there before you bid.

Key facts

Closes
Dec 1, 2026, 3:30 PM ET (9 days left)
Place of work
Location not stated
Notice type
SolicitationA request for offers or bids. This is the notice you respond to.
Solicitation number
N0010426QFG72
Office
NAVSUP WEAPON SYSTEMS SUPPORT MECH
Posted
Nov 17, 2026
Codes
NAICS 332919 | PSC 4820
Contact in the notice
Telephone: 2156974717, lydia.m.shaloka.civ@us.navy.mil
Source
SAM.gov Contract Opportunities

What this is

A plain-English summary has not been written for this notice yet. The facts above come straight from the notice, and the original description is further down this page.

Similar open bids

  • EXPANSION JOINT

    Dept of Defense · Location not stated

    Closes tomorrowSolicitationSmall business set-aside

    Closes Nov 23, 2026, 3:00 AM ET

  • BROOMFIELD COIL WINDING MACHINE

    Dept of Defense · Portsmouth, Virginia

    Closes tomorrowCombined synopsis and solicitationSmall business set-aside

    Closes Nov 23, 2026, 8:00 AM ET

    Dept of Defense posted a combined synopsis and solicitation titled "BROOMFIELD COIL WINDING MACHINE". Place: Portsmouth, Virginia. Responses are due Nov 23, 2026, 8:00 AM ET. The listing has little detail. Read the official notice for the full scope.

  • ODMS-GASKET, ODMS-KIT GASKET

    Homeland Security, Department of · Location not stated

    Closes tomorrowCombined synopsis and solicitation

    Closes Nov 23, 2026, 9:00 AM ET

  • STRAINER SEDIMENT

    Homeland Security, Department of · Location not stated

    Closes tomorrowCombined synopsis and solicitation

    Closes Nov 23, 2026, 10:00 AM ET

  • NOZZLE FUEL INJECTION

    Homeland Security, Department of · Location not stated

    Closes tomorrowCombined synopsis and solicitation

    Closes Nov 23, 2026, 10:00 AM ET

More industrial parts and hardware bids

Recent awards from Dept of Defense

Award notices this agency published, as listed by the source.

Original description from the notice

CONTACT INFORMATION|4|N743.22|WVU|N/A|LYDIA.M.SHALOKA.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|See specification sections C and E| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8||||||||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material|N/A|TBD|N00104|TBD|N39040 - Certifications, S4306A - Material |N50286 |TBD|133.2|N/A|N/A|N39040 - Certifications |N/A| N/A|See DD FORM 1423|PORT_PTNH_WAWF_NOTIFICATION@NAVY.MIL LYDIA.M.SHALOKA.CIV@US.NAVY.MIL| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery |One year from date of delivery ||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(FEB 2026))|2||| WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2||| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEVIATION 2026-O0015)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| This amendment is being issued to change the QTY to 5 EA. 1. DD1423 Data Items with title of "INSPECTION AND TEST PLAN" SUB TITLE "INSPECTION SYSTEM PROCEDURES" are hereby waived. 2. Portsmouth NSY's DODAAC has changed from N00102 to N50286. Any reference to N00102 within this order should be updated to N50286. 3. The following proposed delivery schedule applies: Submission of Certification Data CDRLs will be on or before 20 days prior to scheduled delivery. Weld procedure and qual data 120 days adc LT Approval of weld procedures and qual data 60 days after receipt PNSY review/acceptance of Certification CDRLs 6 working days after receipt of Certification DD 1423 CDRLs. Final delivery of material will be on or before 365 days after effective date of the resulting contract. 4. Any contract awarded as a result of this solicitation will be "DO" rated order; "DO" rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). 5. This order is issued pursuant to Emergency Acquisition Flexibilities (EAF). \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as Special Emphasis SUBSAFE/Non-Level I material and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.2 Test/Inspection Certifications - To allow Contractors to use existing stock of material previously tested with NDT specification revisions that are technically acceptable while minimizing the submittal of waivers/deviations, the following test/inspection specification revisions are acceptable in lieu of their preferred current revisions (where applicable) listed under "Document References" below when they were the current revision as of the date of NDT certification. MIL-STD-1949 Original, Revision A, A Chg Not 2 MIL-I-6868 Rev. E, Revision E Amendment 1, Revision E Amendment 2 ASTM-E1417 1999, 2011 SAE-AMS-STD-2154 2005, 2010 2.2.3 The documents and drawings listed below under DRAWING NO. are not provided with this Contract/Purchase order. DRAWING NO CAGE REV DISTR CD ;21244 78062 E D; 2.2.4 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |230223|A| |01| DOCUMENT REF DATA=ASTM-E1417 | | | |160615|A| | | DOCUMENT REF DATA=ASTM-E1444 | | | |160601|A| | | DOCUMENT REF DATA=MIL-I-6868 | | |E |800606|A| 3| | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=SAE AMS-STD-2154 | | |E |210701|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3. REQUIREMENTS 3.1 Design, Manufacture, and Performance - Except as modified herein, the item furnished under this contract/purchase order must meet the design, manufacture, and performance requirements specified on CAGE ;78062; Drawing ;21244 part number 21244-002; . 3.2 A Certificate of Tests is required for non-destructive, hydrostatic, and operational testing as required by the assembly drawing and the maintenance standard, when invoked. Non-destructive testing must be in accordance with T9074-AS-GIB-010/271, MIL-I-6868, ASTM-E1444, ASTM-E1417, or SAE-AMS-STD-2154. 3.3 Certificate of Compliance - (Special Emphasis SUBSAFE/Non-Level I MATERIAL) - The Contractor must prepare and submit a certificate of compliance traceable to each serialized component, certifying that the components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. 3.4 Each component must be assigned a unique serial number. The component must be marked with this serial number on the major piece part of the assembly. (e.g. body, casing) Serial number marking must be permanently applied in accordance with MIL-STD-792. This serial number must also be annotated on the C of C to provide positive traceability. 3.4.1 In the event of refurbishment, if an existing readable serial number is found on the component, a suffix must be applied to ensure the final serial number is unique. 3.5 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications, or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.6 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.6.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.6.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. 3.6.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.7 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.8 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.8.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.8.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.8.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of SUBSAFE/Non-Level (Q5) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement. 3.8.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.8.5 Any changes made by the Contractor to a qualified quality system will require concurrence by the Government Quality Assurance Representative prior to adoption. 3.9 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. 3.9.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.9.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative. 3.10 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 3.11 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements to apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately." 3.12 Final Inspection - The following inspection must be performed prior to shipping material. 3.12.1 Material Sampling - Material must be inspected for form, fit, and function. Lot acceptance must be based on zero defects and lot rejection based on one defect. The sample size must be in accordance with the sampling plan(s) in the applicable military specification or standard, federal specification or standard, or drawing to which the material was manufactured. In the absence of such sampling plans, sampling inspection must be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code), table IIA (for sample size). SMALL LOT SIZES - For lot sizes of fifty or less, the minimum sample size must be eight units. For lot sizes of eight or less, the sample size must be one hundred percent of the lot. 3.12.2 Material must be inspected for form, fit, and function in accordance with the sampling plan(s) in the applicable military specification or standard, federal specification or standard, or drawing to which the material was manufactured. The absence of such sampling plans, sampling inspection must be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code), table IIA (for sample size) with lot acceptance based on zero defects and lot rejection based on one defect. Due to the high consumer risk associated with small sample sizes, the minimum sample size must be eight units (for lot sizes of fifty or less) or one hundred percent (for lot sizes of eight or less). 3.12.3 The Manufacturer may elect to use Statistical Process Control (SPC) to assure product quality in lieu of the above attribute sampling plan, provided that the SPC methodology/system used provides acceptable products to the Government. However, the Government/Navy Receipt Inspection Activity may perform their acceptance inspection of the material using the attribute sampling plan outlined above. 3.13 See CDRL DI-MISC-80678 (Special Emphasis SUBSAFE/Non-Level I Material C of C) - The certificate of compliance must contain: 1. Contractor's name, address, phone number and date 2. The contract issuing agency's Contract/Purchase Order number 3. The national stock number (NSN) 4. Government nomenclature (noun name) of the item purchased 5. Contractor's nomenclature (noun name) of item purchased 6. Component Serial Number 7. Contractor's or authorized personnel's signature 8. A statement to the effect that all items furnished on this contract are in full compliance with the specifications and requirements. Submission must be in accordance with the Contract Data Requirements List (DD Form 1423). 3.14 See CDRL DI-MISC-80678 (Special Emphasis SS-NON-LI Hydrostatic, NDT per T9074-AS-GIB-010/271, and Operational Testing) - The Certificate of Tests (C of T) shall contain: 1. Contractor's name, address, phone number and date 2. The contract issuing agency's Contract/Purchase Order number 3. The national stock number (NSN) 4. Government nomenclature (noun name) of the item purchased 5. Contractor's nomenclature (noun name) of item purchased 6. Component Serial Number 7. Contractor's or

Source: SAM.gov, General Services Administration (public domain). BidTerrier shows public notices as published and cannot confirm that a notice is complete or current. Details can change, so always check the official notice. Nothing here says whether your business is eligible.