BidTerrierSign in

How to bid on government landscaping and grounds contracts

Facts checked against the official sources below on Nov 14, 2026.

Government grounds work is usually bought as a recurring service contract with a written scope, a schedule and fixed pricing. Read the scope, the wage rules and the due date closely before you price.

How is grounds maintenance bought?

In the uniform contract format used by many federal solicitations, Section B lists the services and prices and Section C holds the description or statement of work. Section B is where your prices go, so read it before you estimate.

Agencies buy mowing, trimming, planting, leaf cleanup and similar tasks as service contracts. The notice describes the site, the tasks and how often they must happen, and asks for a price for a base period, sometimes with option years.

Some jobs are one-time projects, such as a replanting or an erosion repair. Those read more like construction and may carry different rules. The solicitation tells you which it is, so read the description before anything else.

How do seasonal and weather-based scopes work?

Grounds work follows the calendar. A scope might run from spring through fall, or it might cover winter snow and ice management. Watch how the solicitation describes the season, the triggers for service and the response time.

Snow work in particular is hard to predict. The solicitation may ask for a flat seasonal price, a per-event price, or both. Make sure you understand which one you are quoting, and what counts as one event, before you commit to a number.

What does the scope of work tell me?

The statement of work is the most important page. It lists the areas to be maintained, usually with a map or site description, along with frequencies and standards, such as grass height or when walkways must be clear.

Price against what it says, not what you assume. Add up the acreage or area, estimate crew hours per visit, multiply by visits per season, and add equipment, fuel, disposal, supervision, insurance and profit.

Do wage rules apply to landscaping contracts?

Contracts of $2,500 or less do not receive a wage determination, but workers on them must still be paid at least the federal minimum wage. SAM.gov hosts the wage determinations page and the Service Contract Act Directory of Occupations.

They can. The Department of Labor says the Service Contract Act applies to covered US federal service contracts above $2,500, and the wage determination in the contract specifies required wage rates and fringe benefits. Contracts for construction and certain other work are exempt.

Whether your solicitation includes a wage determination depends on how the agency classifies the work, so look for it in the documents. If one is attached, price your labor at or above those rates.

Should I walk the site before I bid?

If the notice offers a site visit, it is worth going. You can check slopes, fences, irrigation heads, obstacles and where snow can be piled. Photos and measurements help you estimate accurately.

Ask your questions in writing through the contact named in the solicitation, before the questions deadline. The agency can answer everyone at once in an amendment.

Is landscaping work set aside for small businesses?

Size standards are set by industry. SBA assigns a size standard to each NAICS code, generally based on the number of employees or on average annual receipts, and it publishes a table you can check. Look at the code on each notice.

Often it can be. The FAR says a contracting officer must set aside an acquisition over the simplified acquisition threshold for small business when two or more responsible small businesses can reasonably be expected to offer at fair market prices. For smaller purchases, a set-aside is the default unless the officer decides otherwise.

The notice states whether work is reserved. If it is, you generally need to qualify as small for the NAICS code on the notice. The set-aside and size standard guide explains how that works.

What happens after I submit?

In sealed bidding, bids are opened publicly at the time and place stated in the solicitation. The FAR says award goes to a responsible bidder whose conforming bid is most advantageous to the government, considering price and the price-related factors in the invitation.

For negotiated buys, the request for proposals lists the evaluation factors and their relative importance, so a low price alone may not win. SAM.gov also publishes award notices, which lets you see who won past grounds contracts and compare their scale to yours.

On CanadaBuys, unsuccessful bidders are notified as soon as possible after award and can request a debriefing, which is a good way to learn how to bid better next time.

Where do I find these bids and what about deadlines?

Federal grounds work is posted on SAM.gov, and Canadian federal work on CanadaBuys. Parks departments, school districts and municipalities post to their own sites. BidTerrier lists open public solicitations and links each one to its official notice.

Late bids are a common way to lose. For sealed bids, the FAR says a bid that arrives after the deadline will not be considered unless an exception applies, so submit early and confirm receipt.

This is general information, not legal advice. Rules change, so confirm details in the official sources listed below before you bid.

Official sources

See open bids